Installation method of CNC lathe


The lifting
and positioning of the machine tool should be carried out using the special lifting tools provided by the manufacturer, and other methods are not allowed. No special hoisting tools are required, and steel wire ropes should be used to hoist and position according to the specified parts of the manual.
Foundation and location
The machine tool should be installed on a solid foundation, and the location should be far away from the vibration source; avoid sunlight and heat radiation; place it in a dry place to avoid the influence of moisture and airflow. If there is a vibration source near the machine tool, an anti-vibration trench must be set around the foundation.
The installation of the machine tool The
machine tool is placed on the foundation, it should be leveled in a free state, and then the anchor bolts are evenly locked. For ordinary machine tools, the level reading does not exceed 0.04/1000mm, and for high-precision machine tools, the level does not exceed 0.02/1000mm. When measuring the installation accuracy, it should be carried out at a constant temperature, and the measuring tool should be used after a period of constant temperature. When installing the machine tool, try to avoid installation methods that force the machine tool to deform. When the machine tool is installed, some parts of the machine tool should not be removed casually. The removal of the parts may cause the redistribution of the internal stress of the machine tool, thereby affecting the accuracy of the machine tool. Preparations before the test run of the
universal tool holder After the geometric accuracy of the machine tool has passed the inspection, the whole machine needs to be cleaned. Use cotton or silk cloth soaked with cleaning agent, not cotton or gauze. Clean off the anti-rust oil or anti-rust paint applied to protect the guide rail surface and the machined surface when the machine tool leaves the factory. Clean the dust from the outer surface of the machine tool. Coat each sliding surface and working surface with lubricating oil specified by the machine tool. Carefully check whether all parts of the machine tool are oiled as required, and whether enough coolant is added to the cooling box. Whether the oil of the hydraulic station of the machine tool and the automatic lubricating device has reached the specified position of the oil level indicator. Check whether the switches and components in the electrical control box are normal, and whether the integrated circuit boards are in place. Turn on the power and start the centralized lubrication installation, so that the lubricating parts and the lubricating oil circuit are filled with lubricating oil. Do all the preparations before the action of each part of the machine tool.



 